2025
In 2025, Yükseliş successfully developed and installed its 8 m/s high-speed elevator system in its test tower. This project increased the company's validated speed from 4 m/s to 8 m/s, strengthening its engineering expertise in high-speed elevator technologies.
The new test shaft successfully validates the traction system, mechanical design, control algorithms, vibration, ride comfort and safety systems under high-speed operating conditions.
The 1.5 MW Solar Power Plant (SPP) has been completed, enabling Yükseliş Elevator to generate most of its own energy while supplying surplus electricity to the grid.